| 1. Environmental target:
improvements to the quality of work and waste air |
||
Measures Project for waste-air scrubbing - investigation into extraction plant and filtering systems (effects, costs |
| 2. Environmental target:
improvements to soil and water protection |
||
Measures a) The open sample and hardening buckets are replaced with sealable vessels Reponsibility: Quality and Environment Period: 1999 b) New filling |
| 3. Environmental target:
reducing our waste water by the volume from the roof drainage system (at least 1000 |
||
Measures a) Connecting the roof drainage system to the "Dorneburger Mühlenbach" b) Utilizing rainwater as cooling water in the newly built automatic batch furnace hardening plant Responsibility: Head of the new production hall, Quality and Environment Period: Till the next environmental audit (2002) |
| 4. Environmental target:
investigation into all environmentally hazardous substances, with subsequent reduction or replacement |
||
Measures Environmental hazard analysis (substitution analysis) Responsible: Quality and Environment Period: 1999 (present substances), continuous (new orders) |
| 5. Environmental target:
20% increase in the proportion of recyclable waste materials |
||
Measures a) Provision of new, clearly designated waste-sorting containers (paper, other waste, oil-contaminated operating material) b) Instruction and motivation of staff for better sorting of waste c) Investigate the possibility of Green Dot containers, and provide these if necessary Responsibility: Quality and Environment, all department heads, all staff Period: 1999 |
| 6. Environmental target:
improved gathering of data for the environmental performance |
||
Measures a) Installation of a PC program for acquisitions b) Creation of a "data form" for annual statistics Responsibility: Acquisitions, Accounts, Quality and Environment Period: 1999 |
|
Web-Design & Translation: Zeres GmbH, Bochum (Germany) Copyright © 1997 Zeres GmbH, Bochum (Germany) |